Thursday, 17 September 2026
Initial Project Content
Added project background and proposal pages
Models Gemini 3.8 FlashSonnet 4.6GPT 5 Nano
Key changes
3- Created project timeline page and first placeholder pages
- Implemented project background page and proposal page
- Implemented lightning attachment animation in background page
Agent successes
2- Created a well-formatted timeline
- (With a lot of hand-holding) made some really nice diagrams on the Background page
Agent failures
2- Was useless at creating a geometry/ diagram representative of an aircraft, even with some reference material
Gemini-3.8 Flashrapidly increased in cost as conversation length increased. This became much more expensive than I anticipated.