Project · MIT 16.S893

Assembling a tile structure in space without tumbling it

A robot that builds a structure in free space pushes on that structure with every move. With no ground to push against, the structure turns. This project simulates how the ORLO* assembly robots build a 10×10 grid of square tiles, each about 160 mm on a side. It then picks a build order and sizes a reaction wheel that holds the structure still.

100

tiles, 160 mm each

6

layouts compared

46.4°

final tilt, no wheel

13.1 min

robot motion with a wheel

Figure 1. The research path. Each step narrowed the design. The literature toolkit runs beside the main track and feeds test methods and prior work into each step.

1. The problem

ORLO* (Orbital Locker Surface Tile Assembly Robot) builds a flat grid from square tiles, each about 160 mm on a side. The study starts with a 10×10 grid in free space. Nothing holds the structure, so its total angular momentum stays zero. When a robot and its tile move one way, the structure turns the other way.

The questions are simple. How long does the build take? How far does the structure turn during the build, and at the end? The simulation tracks every moving body: robots, gantry and tiles. Every number on this page comes from that simulation.

Figure 2. An early 3D run. The structure's orientation changes as the robots add tiles.

2. One robot or two

The original ORLO* design uses two robots. R1 stores the tiles and moves along the Y axis. R2 carries 10 tiles at a time along the X axis, places them, and returns to R1 to reload. This is strategy A1. Strategy A2 uses one robot that carries every tile along a single path and never reloads.

Figure 3. Two robots with return trips (A1, left) against one robot on a single path (A2, right).
Figure 4. A1 tilts the structure less, but it takes 3.6 times longer. It also needs 19 in-place turns that are not yet shown to be possible.

A1 · two robots

1086 s motion · peak tilt 24.4° · final tilt 14.0°

A2 · one robot

304 s motion · peak and final tilt 61.7°

A2 was faster and simpler, so the next studies used one robot. The two-robot idea comes back later in a new form. In that form, two robots move in opposite directions so that their effects cancel.

3. Shapes and paths for one robot

The build order sets how far the structure turns. I tested six layouts with the same assumptions. Three were 10×10 squares: snake, outward spiral and inward spiral. Three were free 100-tile shapes: straight, staircase and elbow. A seeded search found two more square routes, but the snake beat both of them.

Figure 5. Three build orders for the same 10×10 square: snake, outward spiral and a search-found backbite route.
Figure 6. Time against tilt for each 10×10 path. Only the snake and the outward spiral are not beaten on both measures.
Path (10×10) Motion time (s) Peak tilt (°) Final tilt (°)
Snake (baseline) 303.8 61.7 61.7
Spiral outward (selected) 309.1 ~180, not resolved 46.4
Spiral inward 308.6 ~180, failed sampling check 29.2

I also changed the mass and inertia values in 20 robustness runs. 12 runs passed, 8 gave no clear result, and none failed. The snake passed all 10 of its runs, with a peak tilt between 56° and 78°.

The path results in sections 2 to 4 use the first robot and tile values (85 kg robot, 0.5 kg tiles). I re-ran the wheel sizing and the two-robot study with the new values (sections 5 to 7), but not the path search or the robustness runs.

4. The decision: build in an outward spiral

The snake has a lower peak tilt and is about 5 s faster. I chose the outward spiral because of how each new tile joins the structure. From the fourth tile on, most new tiles join two tiles that are already in place. That gives a stronger joint.

Both paths have 18 tiles with only one anchor. In the snake, the full first row of 10 tiles is a straight line with one anchor each. In the spiral, the single-anchor tiles are spread out. Each one starts a new side next to a compact block. The spiral also ends with less tilt (46.4° against 61.7°). A reaction wheel can take care of the high peak.

Figure 7. The outward spiral at the start, the middle and the end of the build.

5. Sizing a reaction wheel to hold the structure still

A reaction wheel stores momentum so that the structure does not have to. To hold the structure still, the wheels must store the opposite of the robot's momentum at every moment. The wheel motors must supply the matching torque:

hwheel(t) = −hrobot(t)    τmotor(t) = −dhrobot/dt

At full robot speed, the spiral needs a peak of 6.9 N·m·s of momentum and 25.5 N·m of torque on the z axis. It needs 3.5 and 4.0 N·m·s on x and y. These numbers use the new robot (35.5 kg) and the new plastic tiles (0.4375 kg, 30 mm thick). No flown wheel has that much torque. The best set has 0.50 N·m, which is about 51 times too small. The fix is to slow each robot move until the wheel can keep up.

Figure 8. Left: the momentum each wheel must store during the spiral, with the new robot and tile parameters. Right: robot motion time when each move slows until the wheel keeps up.
Wheel set Robot motion (min) Wheel mass (kg)
No wheel limit (ideal) 4.40 none
BCT RW4-HT ×3 (recommended) 13.1 9.6
BCT RW4 ×3 18.1 9.6
BCT RW8 ×3 18.1 13.2
BCT RW1 ×3 36.2 3.3
NanoAvionics 4RW0 233.7 0.7

Torque, not momentum, limits the build. The RW8 has more momentum than the RW4, but they give the same time because both have 0.25 N·m of torque. I chose three BCT RW4-HT wheels. A flight-style controller with a noisy gyro and star tracker held the attitude within 0.01° in simulation.

6. Two mirrored robots to remove the yaw wheel

Next I tested two robots that are mirror images of each other. Each robot builds one half of the 10×10 grid and carries 49 tiles. The two seed tiles sit side by side at the centre line. Each half uses a U-cutback path: nested U shapes that grow out from the centre line.

A mirror reverses the turning push of each robot about two of the three axes. When the robots move in step, their yaw (z) and pitch (y) momentum cancel to zero. Roll (x) does not cancel. Both robots drive the same way along the rows and lift tiles at the same row, so their roll pushes add. With no wheels at all, the structure rolls up to 13° during the build and ends rolled by 8°.

Figure 9. The same build with no wheels at all, seen from the (+x, +y, +z) corner, with the new robot and tile parameters. In step, yaw and pitch cancel, and only roll is left (peak 13 degrees, final 8 degrees). If robot B is 0.25 s late, the structure also yaws up to 15 degrees.

With a wheel on roll (and none on yaw), the structure stays still. One flown BCT RW4-HT wheel (3.2 kg) on roll is enough. Robot motion then takes 4.0 min, against 13.1 min for one robot with three of these wheels. Turning one path 180° instead of mirroring it makes the yaw wheel need about three times larger than for one robot.

Figure 10. The same build with ideal wheels on roll and pitch and no yaw wheel, seen from the (+x, +y, +z) corner, with the new robot and tile parameters. In step, the structure stays still. If robot B is 0.25 s late, the structure yaws up to 15 degrees.
Case Wheel momentum x / y / z (N·m·s)
One robot, outward spiral3.51 / 4.01 / 6.90
Mirrored pair, in step1.80 / 0 / 0
Pair, one path turned 180°0 / 0 / 22.8

The catch is timing. If robot B is late, the push from robot A has no partner for that time. The yaw grows by about 0.7° for each 10 ms of delay. To keep yaw below 1°, the robots must stay within about 0.015 s of each other. That needs a shared clock and the same motion plan.

Figure 11. Yaw cancellation against the delay of robot B, with the new parameters. The 1 degree yaw limit is reached at a delay of about 0.015 s.

Which single wheel for the pair?

With the pair in step, the y and z wheels are not needed, so only one wheel on x is left. It must store 1.80 N·m·s and give 13.2 N·m. Torque, not momentum, sets the motion time, as it did for one robot. I retimed the pair with each wheel alone on x, using the same method as before (80% of the rating usable, each move slowed until the wheel keeps up).

Figure 12. Five wheels asked for, plus nine more, as the one x wheel of the mirrored pair. The BCT RW4-HT is fastest (4.0 min, 3.2 kg). The Rocket Lab RW4-0.4 is the lightest fast wheel (7.8 min, 0.75 kg). Lower left is better.
One x wheel Mass (kg) Torque (N·m) Momentum (N·m·s) Pair motion (min)
BCT RW4-HT 3.2 0.50 2.5 3.98
Rocket Lab RW4-12 5.0 0.20 12 5.77
Rocket Lab RW4-0.4 (lightest fast) 0.75 0.10 0.4 7.84
BCT RW1 1.1 0.06 1.0 9.90
NanoAvionics 4RW0 (CubeSat) 0.67 0.006 0.037 34.7

One wheel replaces three, so the wheel mass falls by a factor of 3 and the motion time by a factor of 3.3 to 3.7. The BCT RW4-HT is fastest (4.0 min, 3.2 kg). The Rocket Lab RW4-0.4 is the lightest fast wheel: 0.75 kg for 7.8 min, which saves 2.45 kg. The BCT RW1 is both heavier and slower than the RW4-0.4, but it has far more flight history (162 units against 28 on orbit, from the datasheets). The Rocket Lab RW4-12 has the most torque of the Rocket Lab wheels I tried, but at 5 kg it is heavier and slower than the RW4-HT. The CubeSat unit is too weak: it slows the robots 17 times. In a noisy flight-controller test, the four wheels I tested held the attitude within 0.01° with no saturation.

Which wheel is best depends on whether mass or time matters more. That is my judgement, not a computed result. The result holds only while the robots stay within about 0.015 s of each other. Rocket Lab data come from a 2025 web archive copy of its datasheets. The 4RW0 is a pyramid of four wheels, so using it on one axis is a rough fit.

Each robot here weighs 29.3 kg: a 20 kg crawler (the old lumped value, no parts list yet) and a 9.3 kg structure sized for its own 49-tile stack. Every mass is still an estimate. The first run used a placeholder of 56.7 kg per robot. With the new values the roll wheel need rose from 1.13 to 1.80 N·m·s, and the no-wheel structure ends rolled by 8° instead of 0.4°. The cause appears to be the higher robot centre of mass, but I have not traced the mechanism.

Four robots remove the roll too

One mirror pair cannot cancel all three axes. So I simulated four robots, one in each quadrant of the grid and mirrored across both centre lines. Each robot builds one 5×5 quarter from a seed tile at the centre and carries 24 tiles. The four turning pushes add to zero on all three axes, so no wheel is needed. In step, the peak momentum is 10−14 N·m·s and the tilt stays below 10−15°. The build takes 57 s, against 121 s for the pair.

Figure 13. Four mirror-image robots build the 10x10 grid in step with no wheels at all, seen from the (+x, +y, +z) corner. Each robot builds one 5x5 quarter, with its crawler base under its own tile stack. The momentum of the four adds to zero on all three axes (peak 1e-14 N m s), so the structure does not turn. Rigid, isolated, prescribed motion; robots 26 kg each.

Timing still matters. If one robot starts late, all three axes move: 0.9° of peak tilt at a 0.05 s delay and 4.2° at 0.25 s. If a whole mirror side starts late together, only one axis moves, and the tilt is smaller. The model is the same rigid, isolated model, with no collision check where the quarters meet. In the model the crawler box overlaps the lowest tile by 7 mm. The video draws the base under the stack, but the results use the model as it is.

7. New robot and tile values: what changed

The first robot and tile values were early guesses. The tile was 10 mm thick and weighed 0.5 kg. The 65 kg stack frame came from a solid-tube guess, which is far too heavy to hold plastic tiles. I made a new parameter sheet in which each value has a status: measured, CAD, datasheet, estimate or guess.

The new tile is 30 mm thick and mostly ABS plastic, with 8 small servos and 4 steel pads. A hand calculation sized a light steel frame of four thin posts and ring frames, about 15.5 kg. The simulation now builds the full mass and inertia of the robot and the tile from their parts.

Figure 14. Old values against the new design sheet. The tile is lighter (0.44 kg), the stack frame drops from 65 kg to 15.5 kg, and the robot centre of mass rises from 0.023 m to 0.58 m because the frame is now part of the robot.
Input Old New Note
Tile mass 0.5 kg 0.44 kg mostly ABS, 8 servos, 4 steel pads
Tile thickness / stack pitch 10 / 23 mm 30 / 30 mm 100 tiles stand 3.0 m tall
Stack frame (structure) 65 kg 15.5 kg 4 thin steel posts, rings, base plate
One robot, dry 85 kg 35.5 kg 20 kg crawler + 15.5 kg frame
Each robot of the pair 56.7 kg 29.3 kg frame sized for 49 tiles
Robot centre of mass above the rail 0.023 m 0.58 m the frame is now part of the robot
System, one robot and 100 tiles 135 kg 79 kg

The biggest change is not a mass. The frame is now part of the robot body, so the robot centre of mass moves up from 0.023 m to 0.58 m above the rail. Each move of the robot now swings a tall body, and that adds turning push about x and y.

One robot on the outward spiral

The lighter robot is not easier on the wheels. The x and y wheels must store about 3.5 times more momentum than before. The z momentum is a little lower, but the z torque rose from 18.0 to 25.5 N·m. The build at full speed is 45 s shorter because the robot is lighter.

Figure 15. One robot on the outward spiral. The x and y wheel momentum need grows about 3.5 times, and the z torque need grows from 18 to 25.5 N m. The build at full speed is 45 s shorter, and the time with flown wheels hardly changes.

With flown wheels, the time hardly changes. Three BCT RW4-HT wheels give 13.1 min of robot motion, against 13.5 min before. Torque still sets the time, and the larger torque need cancels the gain from the lighter robot.

Two mirrored robots

The mirror still cancels yaw and pitch exactly. Roll is worse. The x wheel need rose from 1.13 to 1.80 N·m·s. With no wheels, the structure now ends rolled by 8.1° instead of 0.4°. The timing is also tighter: 0.015 s of delay gives 1° of yaw, against 0.019 s before.

Figure 16. The mirrored pair still cancels yaw and pitch. Roll grew: the x wheel need rose from 1.13 to 1.80 N m s, and with no wheels the final roll is 8.1 degrees instead of 0.4. Putting the old robot centre-of-mass height back brings the roll down to 0.3 degrees.

To find the cause, I set one input at a time back to its old value. Only the robot centre of mass height made a large difference: with the old height, the final roll falls to 0.3°. The old stack pitch explains most of the rise in x torque. I have not traced the mechanism further.

Result Old values New values
One robot: x / y wheel momentum (N·m·s) 1.09 / 1.14 3.51 / 4.01
One robot: z wheel momentum / torque 7.33 N·m·s / 18.0 N·m 6.90 N·m·s / 25.5 N·m
One robot: build at full speed 309 s 264 s
One robot: motion with three RW4-HT wheels 13.5 min 13.1 min
Pair in step: x wheel momentum / torque 1.13 N·m·s / 11.5 N·m 1.80 N·m·s / 13.2 N·m
Pair in step, no wheels: final roll −0.4° 8.1°
Pair: delay that gives 1° of yaw 0.019 s 0.015 s
Pair: motion with one RW4-HT on x 3.3 min 4.0 min

Every new mass is an estimate or a guess, not a CAD or scale value. The crawler keeps the old 20 kg lumped value because it has no parts list yet. The rail plane height (23 mm) and the gantry lift (30 mm) are guesses. The frame margins (about 1.5 to 2.2) use an assumed launch load. The path search and robustness runs in sections 2 to 4 still use the old values.

8. What is not yet known

The model treats every body as rigid and isolated. It has no gravity gradient, no joint loads and no flexible modes. The motor limits are not checked against real hardware, and the wheel mass is not yet added to the structure. The map below shows what is checked, what is assumed and what is still unknown.

Figure 17. Validation gap map: what is verified, what is assumed and what is unknown.

Joining the seams sets the real finish time. If each seam takes 600 s, joining takes about 30 hours, and robot motion is less than 0.3 % of the total.

9. Next steps

  1. Real parameters. Replace the guessed masses with Fusion CAD values and a crawler parts list. Then re-run the path search and the robustness runs with the new values, and trace why the higher robot centre of mass adds roll.
  2. Failure recovery. If one robot fails, the other robot must detect the failure, find the state of the build, and finish. I plan to test this with simple simulations and with test methods from the literature.
  3. Path count. Count and score all build orders on the MIT ORCD Engaging cluster.

Side project

A literature review toolkit

This tool is not a step in the main track. It supports my research workflow. Zotero holds the PDFs, and a spreadsheet holds the notes. A Better BibTeX citekey joins the two. Papers are sorted into four stages: value, method, improvement and robustness. Each paper also gets a read level from 0 (skip) to 3 (study).

235

papers logged

332

search queries logged

9

paper cards, 140 quotes checked

Figure 18. How papers enter the workbook and become checked paper cards.

Every paper must have a DOI or another stable ID, so nothing is cited from memory. Every takeaway on a card has a page number and an exact quote. A script checks each quote against the PDF text.

This work started from the project proposal (20 September 2026) on lightweight computer vision for ORLO*. The work moved to assembly strategy and attitude control first, because the vision task depends on them. Session details are in the dev log.